Richmond Upon Thames College

Kilhan commenced the Reinforced Concrete Frame on this prestigious project, which is in the shadows of Twickenham Stadium, in the summer of 2018. This new College consisted of a five-storey external concrete frame with wrapping around a large atrium. Within this atrium another independent concrete frame structure was constructed and housed the college’s Studio Block. The external Frame incorporated various height soffits ranging from 3.25m to over 19m – including a number of link bridges. The falsework to the independent Studio Block had to be designed to CAT 3, which was undertaken by our experienced management team and our temporary works design partners. The Construction News featured this challenging build an article in March 2019. To ensure the challenging programme was kept on track, Kilhan invested further in Peri Skydeck and Multiprop systems to supplement our existing stock of falsework.